Pilot tests

What the pilot build must prove before any bulk import (section 12). Generated from requirements v0.5 by scripts/gen-requirements.ts; do not edit by hand. Cite one as req:aai-pilot#<ID>.

ID Level Requirement
PIL-01 SHALL An organisation issue field changed on a thin-slice workstream item shows the same value in its workstream project and the programme project
PIL-02 SHALL Sub-issue progress from two repositories rolls up into the epic in V1
PIL-03 SHALL an issue with a note kept off GitHub says so in neutral words only (SEC-02)
PIL-05 SHALL A blocked label on a feature sets Delivery health to Blocked on the epic within one run of the Action, and the epic appears in V10
PIL-06 SHALL Every view in section 8.1 returns the right pilot items
PIL-07 SHALL The test partner account sets Integration readiness to Validated on a pilot item with no confirmation comment. AUTO-10 adds the validation-exception label and one comment. Running it again adds nothing more. When the Technical Integration Lead adds the confirmation comment, the label is removed
PIL-08 SHALL Closing a pilot epic as completed sets Programme status to Done through AUTO-03
PIL-09 SHALL Closing a pilot item as not planned sets Programme status to Cancelled, and reopening it sets In progress
PIL-10 SHALL The pinned fields in section 5.3 appear on the issue form for each pilot issue type
PIL-11 SHALL Charts M1 to M5 show the pilot items correctly, or the report records which cannot be built natively