Generated from processes/process/integration-validation.bpmn by gen-processes-viz.ts — do not edit here. All processes

Assured AI programme: confirm a component is ready to integrate

Process_AAI_Validation · strict · 3 step(s)

Integration readiness is proposed by the workstream lead and confirmed by the Technical Integration Lead with evidence (req:aai-design-principles#DP-05). The Validation confirmed: comment is the record; changing the field alone does not count, and no automation sets Validated (req:aai-automation#AUTO-05, #AUTO-10).

BPMN diagram: Assured AI programme: confirm a component is ready to integrate

How it connects

  • Called by: no call activity names this process
  • Calls: none
  • Presented on: no docs page section shows this diagram

Lanes — who acts

lane role what it does here
Workstream lead workstream-lead Owns the workstream’s delivery and its project (req:aai-design-principles#DP-02). Proposes epics; never creates them.
Technical Integration Lead technical-integration-lead Confirms validation with a comment starting Validation confirmed: and the evidence (req:aai-design-principles#DP-05, req:aai-automation#AUTO-10).

Steps

Every one of the 3 step(s) is documented.

step lane skill / sub-process what it does
Set Integration readiness to Ready to integrate
A_Ready
Workstream lead — With the evidence linked in the issue. The item then appears in V6’s “Awaiting validation” filter, the Technical Integration Lead’s queue (req:aai-views#V6).
Check the evidence
A_Check
Technical Integration Lead — With the relevant workstream leads and subject-matter experts.
Post Validation confirmed: and set Validated
A_Confirm
Technical Integration Lead — A comment starting Validation confirmed: with a short note or evidence link, then Integration readiness = Validated (req:aai-automation#AUTO-10).

Decisions

Every one of the 1 decision(s) is documented.

decision what decides it branches
Validated?
GW_Valid
The Technical Integration Lead’s judgement, never inferred from closed sub-issues. no → Not yet: back with the workstream
yes → Post Validation confirmed: and set Validated