Processes fhir-harness-processes
Derived: every BPMN process, with its own documentation, its lanes, and the skills its activities name. Sub-graph fhir-harness/processes.
This is an index, not the documentation. It says what exists and what each
artefact declares about itself. What a process is for, when you would be in it, and
what it is not, is authored beside it and reuses these entries rather than restating them —
see the
auto-docs skill.
- core-processes folio-assistant-core/processes 18
- fhir-harness-processes fhir-harness/processes 5
- processes cat-harness/processes 67
- sci-processes folio-assistant-sci/processes 3
- smart-base-house-processes smart-base/processes 5
- smart-base-processes smart-base/methodologies/processes 1
| Artefact | What it declares about itself |
|---|---|
An IG site, built from the AST on its cache branchfhir-harness/processes/content/ig-ast-cache.bpmn | How an IG repository's own site is published, and how the AST it is built from is kept current (skill ig-build-pipeline §"The AST cache lifecycle").activities 5 lanes Publication manager (owner, or the agent the owner delegates to) · Site build (agent, stage-local) · AST refresh (GitHub runner: IG Publisher with the AST exporter) skills compiled-artefact-cache, ig-ast-delta, ig-build-pipeline, ig-publisher-fork, ig-render-jekyll |
Is the incremental IG AST what a full build would have produced?fhir-harness/processes/content/ig-ast-delta-review.bpmn | The review step of an incremental FHIR IG build, as its own subprocess: list and inspect the differences between the incremental IG AST and what a full build would have produced, then accept them or raise a finding. activities 4 lanes Incremental build (system) · QC reviewer · Work plan — beans (shared by humans and agents) skills ig-ast-delta, todo-manager |
Incremental IG buildfhir-harness/processes/content/ig-incremental-build.bpmn | A proposed incremental build for a WHO SMART Implementation Guide: compile, validate and re-render only the dependency cone of a change, then gate on QA and deploy. activities 19 lanes FHIR modeller / PR author (person + authoring agent) · Work plan — beans (shared by humans and agents) · Incremental build (system) · Publisher + validator services (JVM) · PR reviewer / QC reviewer · Publication manager — deploy and seed skills content-publish, fhir-validation, ig-publication, l3-fhir-authoring, quality-control, todo-manager |
L3 FHIR IG pipelinefhir-harness/processes/content/l3-fhir-pipeline.bpmn | How an L3 FHIR Implementation Guide is authored in FSH, built with SUSHI, the validator and the IG Publisher, reviewed and published, starting from a source model that is ready. activities 7 lanes FHIR modeller · Work plan — beans (shared by humans and agents) · Build pipeline — SUSHI · validator · IG Publisher · QC reviewer · Publication manager skills content-publish, fhir-validation, ig-publication, l3-fhir-authoring, quality-control, todo-manager |
Questionnaire wireframe reviewfhir-harness/processes/content/questionnaire-wireframe-review.bpmn | A built FHIR Questionnaire shown the way a person will meet it — a mid-fidelity wireframe at web and mobile width, and a live LHC-Forms form view — checked field for field against the L2 wireframe it was derived from, r… activities 10 lanes FHIR modeller · Build pipeline — rendering, screenshots, fidelity · Business analyst — design review · Clinical reviewer — the staged form skills content-feedback, feature-staging, fhir-questionnaire-wireframe, l3-fhir-authoring, staging-review, wireframe-design-review |