Is the incremental IG AST what a full build would have produced?
Process_IgAstDeltaReview · advisory · 4 step(s)
The review step of an incremental FHIR IG build, as its own subprocess: list and inspect the differences between the incremental IG AST and what a full build would have produced, then accept them or raise a finding. THE REVIEW STEP OF AN INCREMENTAL IG BUILD, drawn as its own subprocess (bean a9tx, owner 2026-09-30: “list and view differentials/deltas against AST … as part of (sub-?)process/skills/tools, including pipeline rendering”).
WHERE IT SITS. In ig-incremental-build.bpmn it belongs between Task_Merge and Task_Qa: after the restored and rebuilt records are merged, before the QC gates read the aggregate. That diagram predates the AST work and is not edited here; ig-ast-delta §”Where this sits in a process” states the placement until it is.
WHAT IT GUARDS. An incremental build rebuilds only the cone of a change, computed on the BASE edges. If the cone rules miss a coupling, a resource that should have changed does not, and nothing downstream can tell: the merged AST looks exactly like a correct one. So a person reads the delta, and a difference nobody can explain is treated as a missed coupling rather than as a curiosity.
WHAT IT DOES NOT CLAIM. A clean review says the delta is explained, not that the IG is correct. The AST stays a cache: every rendered page carries the provisional mark, and a release is still cut from a full build (ig-publisher-reduction P4).
How it connects
- Called by: no call activity names this process
- Calls: none
- Presented on: no docs page section shows this diagram
Lanes — who acts
| lane | role | what it does here |
|---|---|---|
| Incremental build (system) | build-pipeline | Checks that the base AST still matches the IG’s inputs, then diffs base against head and renders the delta pages. Both steps are mechanical and read files only; neither decides anything a person has to own. A stale or undeterminable base ends here, before any delta is shown, because a delta against the wrong base explains nothing. |
| QC reviewer | qc-reviewer | Reads the rendered delta and answers one question: is every difference explained by the change? This is the only judgement in the subprocess, and it is a person’s (or a reviewing agent acting in this role) because “explained” depends on what the change was meant to do, which no tool knows. |
| Work plan — beans (shared by humans and agents) | work-plan | Where an unexplained difference is recorded before the run falls back to a full build: a note on bean a9tx under W8, naming the resource and the path, so the cone rules get fixed rather than the difference being forgotten when the full build comes back green. |
Steps
Every one of the 4 step(s) is documented.
| step | lane | skill / sub-process | what it does |
|---|---|---|---|
Check the base AST against the IG’s inputsTask_Validity | Incremental build (system) | ig-ast-delta | ig-ast.ts validity <base> --ig <root>: folio-assistant-core’s compiledValidity on the manifest’s inputs, with the input digest recomputed by the same algorithm as the Java writer. Exit 0 valid, 1 stale-inputs (names which input), 2 cannot-tell. Run against the BASE revision’s checkout. |
Diff base → head and render the delta pagesTask_Diff | Incremental build (system) | ig-ast-delta | ig-ast.ts diff <base> <head> --plan plan.json --site <site>/ast-delta/: resources added, removed, changed (with an element-level differential) and version-changed; edges added and removed; the plan’s decision. Every page opens with the provisional mark and is wrapped in raw so narrative Liquid is not executed. |
Read the rendered deltaTask_Review | QC reviewer | ig-ast-delta | Start at the delta index; open each changed resource’s page. Check builtAt before judging: a resource carried from the base was not rebuilt, so a difference there is the change itself or a missed coupling, never noise. The differential is structural: a reordered repeating element shows at every index. |
Note the missed coupling on the beanTask_FileCoupling | Work plan — beans (shared by humans and agents) | todo-manager | Append to bean a9tx (W8): the resource key, the differential path, and why it is unexplained. Check before creating: beans create is not idempotent. A note, not a new bean, unless the owner asks for one. |
Decisions
Every one of the 2 decision(s) is documented.
| decision | what decides it | branches |
|---|---|---|
Base AST valid for its inputs?GW_Valid | Answered by Task_Validity’s exit code. 0 takes yes, into the diff. 1 (stale-inputs) and 2 (cannot-tell) both take no: cannot-tell is never a pass, and a delta against a base that may not be what it claims explains nothing. | yes → Diff base → head and render the delta pages no — stale or cannot tell → Base stale — run a full build |
Every difference explained?GW_Explained | Answered by the reviewer in Task_Review. yes when every added, removed and changed resource is accounted for by the change. no when any is not, including a resource that SHOULD have changed and did not, which the delta shows as absent rather than as a row. | yes → Delta accepted — on to the QC gates no → Note the missed coupling on the bean |