A plan request stops at a signed-off plan
Issue #2405, owner
2026-10-07, verbatim: “if we make a request for a plan you should ALWAYS have
created a requirements document and work plan for us to review before
implementation. the links should shared to the user”. Decisions accepted the
same day (comment):
this operation lives in folio-assistant-core; the methods that say
how requirements are gathered (crdm, spec-kit) stay in cat-harness, and
each points here.
The trigger incident. A plan was given only in chat, and implementation started (litlfred/test#2) before any requirements document existed. The document was written afterwards. Nothing was wrong with the plan; the owner had no artefact to review before work began, and so no point at which to say no.
The trigger — a request for a plan
Any of these, in the owner’s or a stakeholder’s words, is a plan request:
- “plan”, “make a plan”, “plan the …”, “what’s the plan for …”
- “approach”, “what approach would you take”
- “proposal”, “propose …”, “draft a proposal”
- “how would you …”
- “come up with …”
Always — content requests included. “Plan the edits to chapter 3” is a plan request exactly as “plan the new validator” is (decision 2). What changes between them is which methodology governs, never whether the gate applies.
A request to do a thing is not a plan request, and does not acquire one by
being large. That is the opening brief’s job
(opening-brief),
which is said in chat and does not stop.
What to produce — two artefacts
- A requirements document. Every requirement in it follows the ONE
definition in
requirement-definition: a statement, a conformance level, a source, at least one success criterion with its verification method, and a sign-off owner. - A work plan. Beans — one or more per requirement — each naming the
req:statements it delivers and carrying a## Done whencopied from their success criteria. The rule and the shape are inrequirement-definition§”The work plan is beans”.
Where they go — the methodology decides, the gate does not
Which methodology governs is decided by the existing fork in
crdm-detect §”Which
requirements methodology”. This skill does not re-decide it, and never
blends the two (methodology-adoption).
| methodology | requirements document | work plan |
|---|---|---|
| crdm — stakeholder-facing, the answer depends on a folio’s subject | committed under the owning harness’s docs/proposals/ | beans on the same branch, linked from the document |
| spec-kit — platform capability, content-agnostic | the spec, posted as a comment on the governing issue (never a specs/ directory — spec-kit says why) | beans, linked from the spec comment |
Either way the issue is the review surface: a CRDM document is linked from a comment on it, a spec-kit spec IS a comment on it.
Hand over both as permalinks (STRICT)
Every link handed to the user is an absolute GitHub permalink:
https://github.com/<owner>/<repo>/blob/<sha>/<path>
— with the commit sha, never a branch name, and never a repo-relative path. Two reasons, both observed in the trigger session:
- A repo-relative path is not a link.
docs/proposals/x.mdin chat is clickable only when the reader’s working directory is that repository, and a person reviewing from claude.ai or a phone has none. - A branch link moves. The document the owner signs off must be the
document that was reviewed; a link to
blob/<branch>/shows whatever was pushed since. The sha pins it.
Get the sha after pushing: git rev-parse HEAD, then compose
https://github.com/<owner>/<repo>/blob/<sha>/<path>. An issue comment is
already absolute (…/issues/<n>#issuecomment-<id>). This binds every
hand-over — a turn report, a PR body, an issue comment — not only a plan;
turn-reporting
rule 8 points here.
Then STOP until sign-off is recorded on the issue (STRICT)
After posting both links, the agent ends the turn. The requirements
document is a requirement set at stage proposed
(requirement-definition §”The document is a
requirement set”). No implementation —
no schema edit, no script, no skill text, no content block — until sign-off
is recorded on the issue: a comment from the sign-off owner (or quoting
them verbatim, with date) saying the plan is approved, or approving it with
changes — and the decision is then recorded as a requirement-signoff
attestation that moves the set to approved, which check:requirements
refuses unless the signer is a human. Silence is not sign-off. A reaction is not sign-off. An approval in
chat is real but not yet recorded: the agent quotes it on the issue, dated,
before starting.
What is allowed before sign-off: the requirements document and its revisions
(docs/proposals/ or the issue), the beans that ARE the work plan, and the
branch and draft PR that carry them —
continual-progress
still applies to the plan itself.
This gate does not replace the methodology’s own sign-off steps. CRDM’s
stakeholder sign-off (crdm-signoff.bpmn, crdm-close.bpmn) and spec-kit’s
spec-before-code gate run unchanged; this is the point at which a plan
request reaches them, not a second set of them.
A breach is detectable
The test that makes it so (issue #2405 scenario P1): no commit outside
docs/proposals/ and beans/ lands on the branch before the sign-off
comment’s timestamp. Compare git log --format='%cI %H' --name-only on the
branch against the sign-off comment’s created_at. Extending bean 4kq7’s
spec-before-code gate to run that comparison mechanically is that bean’s
work; until it lands, a reviewer runs it by hand.
What this does NOT mean
- It does not mean every request gets a requirements document. Only a request for a plan does. A request to fix a typo is a fix.
- It does not mean the agent asks permission to write the plan. Writing it is the request; stopping comes after.
- It does not mean the plan must be long. A two-requirement plan with two beans is a plan, and is reviewed faster than a long one.
Cross-references
requirement-definition— the one definition of a requirement, and the work-plan rulecrdm-detect,spec-kit— the methods, which point hereissue-working— what an issue is for, against a PR and a bean