pr-description — a PR body a first-time reader can follow
Owner, 2026-10-02, on litlfred/fhir-ig-publisher#8: “PR should be readable
for human for first time. what probelm trying to address, why, how approached,
constratins, soltion… …usage”, then “make that a general skill when
writing/updating PRs”. Issue #1879, bean 19wc.
What a PR description is for
The reader has not been here. A reviewer, the owner coming back a week later, or the next agent opens the PR cold. The description is the one place they can learn what the change is for, without the chat, the bean or the commit log. If they need any of those to follow it, it has failed.
The failure this replaces is the change log: commit titles turned into bullets (“W5/W6 — incremental plan”, “fix fsh-index path”, “one file per key”). Every line is true, and only the author can read it. #8’s first description was exactly that.
The sections, in order
| # | section | answers | test |
|---|---|---|---|
| 1 | The problem | what is wrong or missing today, concretely | a reader could explain it to a colleague without reading the code |
| 2 | Why it matters | who it hurts, and what it blocks | names a person, a process or a measured cost, not “improves quality” |
| 3 | The approach | the shape of the solution, and the alternatives set aside | says why THIS shape, not only what |
| 4 | Constraints | what the solution had to respect: owner rulings, invariants, things it must not change | each one is a reason a reviewer would otherwise ask “why not just…?” |
| 5 | The solution | what changed, grouped by idea, not by commit | a table or short list, at most one line per idea |
| 6 | How to use it | the commands, flags or pages a reader runs or opens | copy-pasteable, with prerequisites stated |
| 7 | What is not done | untested paths, known gaps, follow-ups | nothing a reviewer would be surprised by later |
| 8 | Status | the live checklist (continual-progress invariant 3) | CI state on the CURRENT head |
Scale it to the change. A one-file fix can be three short paragraphs: problem, fix, verified by. The order still holds, and so does “why”, because “why” is the section a reviewer cannot reconstruct from the diff.
These are the questions opening-brief asks in chat
before the work starts. The PR description is their durable form, updated
with what the work found.
Rules
- Expand every identifier on first use. Not “fixes
wnhh” but “beanwnhh: SUSHI and the IG Publisher cannot run locally without packages.fhir.org”. Not “W7”, but “W7, the incremental rebuild”. - Every number carries its provenance: measured on which head, by
which command, or carried from where. The table in
opening-brief§”The four parts” applies unchanged. - Say what is not verified in its own section. Not as a hedge buried in
a bullet.
continual-progress§”What to do with the thing you could not verify” is the rule; this is where it goes. - A decision you hand the reader follows
interaction-modality§4.1: context, then options, then a recommendation, then the question. The test is whether the reader can answer without opening anything. - Link, never paste. A long log, a full diff or a measurement table goes in a comment, a committed sidecar or a linked page. The description carries the conclusion and the link.
Updating a PR: comments, not edits
Owner, 2026-10-02: “updates to PRs should be mainly comments, not on original text”. A reader who has already read the description must be able to trust that it still says what it said. A change they need to see goes where GitHub shows it as new, which is a comment: a push, a CI round, a review answered, a decision taken.
Two exceptions are edited in the description itself:
- Status is updated in place. It has two parts, and both stay current:
- structured: the status checklist
(
continual-progressinvariant 3), with the bean and its epic, each linked, and the CI state on the current head; - narrative: two or three sentences on where the work stands and what it waits on.
- structured: the status checklist
(
- Scope changes are recorded, never overwritten. Keep the original
problem and solution text. Add a dated entry under
## Scope history: what changed, why, who decided, and what it supersedes. Strike through (~~…~~) any original line it invalidates, instead of deleting it. A reader can then see both what was first proposed and what is being merged.
Anything else, such as a better phrasing or a fact found later, goes in a comment.
Cross-reference everything
Owner, 2026-10-02: “maximize use of x-ref and links to beans/epics etc and the dashboard”. Every identifier is a link:
| thing | link to |
|---|---|
| bean | its file, beans/defs/<id>--<slug>.md, on the PR’s head branch |
| epic or milestone | the same, plus the beans dashboard at <site>/beans/ (for this repository, https://litlfred.github.io/folio-assistant/beans/) |
| issue or PR | a full owner/repo#N link, never a bare #N across repositories |
| skill or process | its file, or its page under <site>/reference/ |
| a measurement | the committed sidecar or the CI run that produced it |
The dashboard has no per-bean deep link yet. Its epic scope lives only in page memory, so a link opens the whole board. Until it gains one, link the bean’s file for the bean, and the dashboard for the overview.
What never goes in it
- Credentials, tokens, internal hostnames, or anything outside the diff. The same rule as for PR templates.
- Model identifiers. The footer carries the session link, not the model.
- Chat shorthand that only the session understood: “per the 2y ruling”, “Q4”, “round 3”. Say what the ruling was.
Worked example
litlfred/fhir-ig-publisher#8, before and after, 2026-10-02.
- Before: “What’s in it”: twelve bullets, one per commit (“W1:”, “W2:”,
“
-fsh-users:”, …), then “Housekeeping”. Accurate, and unreadable to anyone who did not write it. - After:
- The problem: the Publisher is all-or-nothing, and what a build knew is thrown away.
- Why it matters: folio-assistant needs a structured record of a build to detect staleness, review changes and eventually rebuild part of an IG.
- The approach: a library on top of the Publisher, staged W1 to W7, with a table of what each stage adds and its state.
- Constraints: the Publisher is not modified; an AST is a cache, never an authority; “cannot tell” means a full build.
- How to use it: three commands.
- What is not done: W7 has never run end to end, and a stray
.pycwas committed.
Relationship to other skills
continual-progressowns the status checklist and the rule to open the PR at the first commit. This skill owns everything above that checklist.opening-briefasks the same questions in chat before the work starts. The description answers them for a reader after it.prepare-mergerecords gate results in the body, in the gate’s own terms, and adds them under Status.issue-working: the issue holds the request and its sign-off, and the PR description links it in the first line rather than restating it.
Staging links
When a staging preview exists, every request this skill makes for feedback,
review or sign-off carries it: one deep link per changed page, to the anchor
where the change sits, with the same page on main as before. Where the skill
declares an output contract, they go in its stagingLinks field. The rule, and
where the page list comes from:
staging-review §”The deep-link rule”.