CRDM requirements workflow

Once a feature request is detected (see crdm-detect.md), the agent follows this workflow to gather, validate, and implement requirements collaboratively.

Actors

ActorRoleSwim lane
BA / Feature RequestorThe person who identified the need and coordinates the CRDM process. Acts as Business Analyst: interacts with the agent, reviews increments, translates stakeholder feedback into agent-actionable direction. May be an author, editor, programme lead, or reviewer.BA / Feature Requestor
AgentThe LLM agent running in the folio-assistant harness. Facilitates the process, synthesises inputs, implements on feature branches, posts summaries to the issue. Interacts with the BA only, not with stakeholders directly.Agent
StakeholdersThe people affected by the feature who must review and approve it. They participate at defined checkpoints (needs confirmation, requirements approval, MVP testing, feature sign-off) — not in the day-to-day development loop. Examples: review committee, country programme managers, IT teams, end users.Stakeholders

BPMN reference

processes/process/crdm-requirements.bpmn is the outer process — detection, the Feature? decision, then six phases, each a real subprocess in its own file:

phasefilewhat happens
Link the work to an issuecrdm-issue-linking.bpmnscan, then link or ask; never create without permission
Phase 1 — needscrdm-needs.bpmnstakeholders, needs statement, loop until recognised
Phases 2–4 — BPA + requirementscrdm-requirements-definition.bpmncurrent workflow, requirements, impact, loop until approved
Phase 4b — prioritization(inline in Phase 4 exit)dependency-order capability areas, formalize-first rule, BA confirms
Phase 5 — beans + sign-offcrdm-signoff.bpmnrequirements become beans, BA signs off, branch announced
Phase 6 — implement + acceptancecrdm-deliver.bpmnimplement, review increment, share MVP, take findings
Close-outcrdm-close.bpmnstakeholder sign-off, BA confirmation (an adjudication, recorded as a requirement-signoff attestation that moves the set to accepted), then the close

Nothing about running it changes. Step ids are unchanged, so workflow_complete still takes A_Implement, A_Close, BA_Signoff by name; the interpreter enters a phase by itself and workflow_next tells you which one you are in (inside: Phase 6 Implement + acceptance). You cannot complete a phase — a phase is done when its steps are.

Phase 6 is one subprocess and not three because the loops say so: a rejected increment, an MVP that is not ready, and stakeholder findings all route back into implementation. A subprocess has one exit and cannot be re-entered once finished, so splitting that region would have changed what the diagram says.

Every question you put to the BA carries its context first (STRICT)

This process is almost entirely questions. Six phases of them — needs, process, requirements, impact, sign-off, feedback — and each one is the agent handing a decision to a person who was not inside the analysis that produced it.

So the ordering rule in interaction-modality.md §4.1 governs this whole workflow, not just its explicit checkpoints: context → options → recommendation → question. Its test applies unchanged:

Can the BA answer without opening anything?

Feature work breaks this in a way content work does not, and the reason is worth naming. The agent has just done impact analysis, read the schemas, traced the consumers — and the vocabulary it built doing that is the vocabulary it asks in. Terms coined during the analysis feel defined, because to the agent they are. Three specific traps:

  • An option name you invented. “Prefix-at-rest or prefix-at-install?” names two things that exist nowhere outside your own head and your own issue. Describe what each one does instead, and put the coined name in parentheses if it earns its place at all.
  • A question that resolves to “go read the issue”. The issue is where the BA goes for depth. It is never where the question’s terms are defined — and posting a question whose answer requires reading it is how a one-character decision becomes a twenty-minute one.
  • Options without their costs. “A or B” is not a choice; “A, which changes nothing here, or B, which rewrites every bootstrap.processes:skill ref in the diagrams” is. The BA is deciding on the consequences, so the consequences are the question.

This applies to every surface this workflow uses: the chat, the summary comment posted to the issue after each round, the PR body, and a bean’s ## Done when. A question buried in an issue comment with its context two comments up is the same defect wearing a different hat.

Phase 1 — Needs assessment

Input: the feature request (from chat, issue, discussion, or upload)

  1. Identify the requester — who is asking?
  2. Identify stakeholders — who else is affected? Check:
    • <name>.config.json roles across active folios
    • GitHub CODEOWNERS
    • Recent activity on related issues
  3. Gather source material — the request may come from:
    • Chat messages in the current session
    • A GitHub issue body or comment
    • An uploaded document (Word, PDF) in uploads/
    • A referenced document in library/
    • An attachment to a GitHub issue comment
  4. Synthesise a needs statement — write a clear, jargon-free statement of what is needed and why, with rationale linking to a concrete workflow
  5. Post to the issue — the synthesised needs statement goes on the GitHub issue as a comment, not in chat
  6. Request feedback — ask the requestor and stakeholders to review

Loop: iterate until the needs statement is approved.

Phase 2 — Business process analysis

Input: approved needs statement

  1. Find the current workflow — check processes/**/*.bpmn for existing process diagrams that cover the affected area
  2. Map the gap — where in the current workflow does the need appear? Identify the specific activity or decision point
  3. Document current state — if no BPMN exists, document the as-is workflow in prose or create a new BPMN fragment
  4. Identify bottlenecks — probe for the real pain point behind the stated request

Post to the issue: current-state workflow description with gap identified.

Phase 3 — Requirements definition

Input: current-state analysis with identified gap

For each requirement:

  1. Functional requirement — stated as “SHALL” / “SHOULD” / “MAY”
  2. Proposed implementation:
    • Skill file (name, location, description)
    • MCP tool registration (if applicable)
    • Schema changes (Zod types, block kinds, constraints)
    • Pipeline changes (validators, renderers, scripts)
  3. Acceptance criteria — testable conditions
  4. Consumer burden — see below. A requirement that shifts work onto the consumer is not done.
  5. Cross-references — link to related documentation pages under docs/source/, existing skills, existing workflows
  6. Wireframe candidates, when a requirement changes a rendered surface — a page, a visualiser, the navbar, a form, an app screen. Before anything is built, run wireframe-design-review in Design use (Call_Wireframe in crdm-requirements-definition.bpmn): at least two candidates, each with a web and a mobile layout, committed as assets of the proposal under docs/proposals/<slug>/wireframes/ on the feature branch, and shown where the requester will look, chosen from context — the conversation, the issue the request came from, the PR, or several — each place carrying the same STAGING deep links and screenshots (staging-review, the deep-link rule, point 5). The candidates are the options Phase 4’s comparison lays out; the requester or BA chooses one at the review. Record “N/A — no rendered surface” in the template otherwise. Owner, 2026-09-23 (wiregen): “wireframe is part of design process for adjudication”.

Consumer burden is a requirement, not a nicety (STRICT)

Every requirement states what a downstream consumer must do to use the result — and the target is nothing.

The standing rule, from the repository owner: a downstream consumer must never have to string-manipulate, re-derive, or assume a rule in order to use what we publish. If an artefact makes a consumer parse a name, strip a prefix, substitute a base URL, or know a convention that is written down only in prose, the requirement is not met.

Ask it in this form, because the failure is always phrased as a saving:

“We don’t need to emit X — it can be derived from Y.”

That sentence is the smell. It is true and it is the wrong trade. A rule a consumer has to know is a rule a consumer can get wrong, and the cost of being wrong is paid by someone who cannot see the code that made the assumption reasonable. Emitting the derivable field costs bytes in an artefact that is regenerated on every build; the derivation rule costs correctness in every consumer, forever, including ones not written yet.

Worked example, 2026-09-18. A preview knowledge graph’s nodes could link back to their canonical counterparts by swapping one base URL for another — the fragment is identical by construction. The recommendation was to document the rule and emit one link at document level: 1 field instead of 968. Overruled, correctly. The 968 explicit prov:alternateOf links shipped, because an agent consuming the graph should follow a link, not implement a substitution.

Three checks that catch most of it:

  • Would a consumer in another language need our source to understand this? If yes, emit the field.
  • Is the convention stated anywhere a machine can read? Prose in a skill is not machine-readable. A typed term in a @context is.
  • Does the artefact answer “what am I?” from itself? A preview that needs an external convention to be told apart from the canonical version fails this. Put it in the type, not in a filename or a path segment.

This is also why the declaration file keeps a fixed name while artefacts are stub-named: a consumer must be able to open a repository it has never seen without first deriving a filename. See directory-conventions §Naming.

Post to the issue: structured requirements with acceptance criteria.

Phase 4 — Impact analysis

Input: defined requirements

  1. Schema impact — which types, constraints, builders change?
  2. Pipeline impact — which scripts under pipeline/ are affected?
  3. Adapter impact — paper, document, dak? Does it ripple?
  4. QA impact — new criteria? Modified criteria? Registry changes?
  5. Folio impact — which active folios need migration?
  6. Consumer impact — what must every downstream consumer change, and what must it now know? An impact analysis that lists only our own files has measured half the change. Enumerate: fields added or removed from published artefacts, IRIs or filenames that move, conventions a consumer would have to learn. A convention added is an impact, even when no file changed shape.
  7. Test plan — what tests to add or update? Include at least one that asserts the consumer-facing contract, not only the internal one — a test over the emitted artefact, not over the function that built it.
  8. Migration plan — steps, rollback, what breaks without it

Post to the issue: impact assessment and migration plan.

When the analysis yields more than one viable approach

Phase 4 often ends with a choice rather than a plan, and that is the moment the BA is handed a decision. Not a list of approach names with the analysis linked: a comparison, per decision-comparison — per option its pro, its con, what it changes downstream and how reversible it is, laid out where the rows can be read against each other, then one recommendation and a stated default.

Items 1–6 above have just enumerated the downstream question for the change as a whole; per option is that same question once per row, so an agent that leaves the column empty is discarding work it has already done. And this phase breaks the rule more than any other, because the vocabulary it just built feels defined to the agent and is new to everybody else.

Phase 4b — Prioritization and dependency ordering

Input: impact analysis complete, possibly multiple capability areas identified

When a feature request decomposes into more than one capability area (as most non-trivial requests do), the agent must explicitly order them before creating beans. This is not optional — skipping it produces a flat bean list with no implementation sequence, and the first session that picks it up will either guess the order (often wrong) or ask the BA (wasting their time on a question the analysis already answered).

The prioritization protocol

  1. Identify capability areas — each is a coherent cluster of requirements that can be implemented and reviewed independently. Name them.

  2. Map dependencies — draw the dependency graph:
    • Does area A define concepts that area B assumes?
    • Does area A produce artefacts that area B consumes?
    • Does area A change structure that area B builds on? If yes, A must precede B.
  3. Apply the formalize-first rule — within the dependency order:
    • Structural/organizational work first (taxonomies, indexes, schemas)
    • Process/policy formalization second (skills, workflows, conventions)
    • Implementation third (code, pipelines, tools)
    • Visualization/UI last (dashboards, pages, views)

    Only the UI’s build comes last. Its wireframe is designed and approved in Phases 3–4 (step 6 of Phase 3), so the order fixes when it is implemented, not when it is decided.

    This is not arbitrary — a visualization built before the process is formalized will be rebuilt; a process formalized before the structure is organized will reference the wrong paths.

  4. Present the order to the BA — as a dependency chain, not a list:
    Area 5 (structure) → Area 2 (process) → Area 3 (review) → Area 4 (planning) → Area 1 (visualization)
    

    With one sentence per arrow explaining why the dependency exists.

  5. BA confirms or reorders — the agent proposes, the BA decides. The BA may override the dependency order (e.g. “I need the visualization first even if it’s throwaway”) — that’s a legitimate business decision, and the agent records it as such rather than arguing.

What this step produces

  • A numbered list of capability areas in implementation order
  • A dependency rationale for each ordering decision
  • An estimate of scope per area (bean count)
  • A recommendation for which areas constitute the MVP release

Post to the issue alongside the impact analysis. This becomes the input to Phase 5’s bean creation — beans are created in dependency order, not in the order the BA mentioned them.

Cross-domain applicability

This step applies identically to code features, paper milestones, and project deliverables. The formalize-first rule is domain-independent: a paper’s structure (chapter order, block kinds) must precede its content (prose), which must precede its presentation (PDF layout).

Phase 5 — Sign-off and bean creation

Input: requirements + impact analysis reviewed and approved by stakeholders

  1. Post sign-off summary on the issue — what was agreed, what was deferred — and record it. BA_Signoff is an adjudication (issue #2405, FR-013): the BA answers approve, amend, reject, defer or cancel, and A_RecordSignoff appends a requirement-signoff attestation for the requirement set (who, when, scope, outcome, the stage it moves the set to, the reason, and the permalink to the issue comment). GW_SignoffRecorded reads it back, so the phase cannot continue on a sign-off nobody recorded. An agent records the BA’s decision; it never makes it.
  2. Create beans for each implementation unit — each naming the req: statements it delivers, with ## Done when copied from their success criteria, and listed in the set’s workPlan (a set at planned with no beans is refused):
    • Follow the check-before-create protocol (see todo-manager.md)
    • Scope to a single PR-sized unit
    • Reference the parent issue in each bean
  3. Offer the knowledge-graph destinations for the agreed set — A_OfferKg, BA_ChooseKg, A_RecordKg in crdm-signoff.bpmn. This step is not optional and its default creates nothing. See below.

The agreed set is an ASSET, and Phase 5 is where it gets a home

Owner, 2026-09-21, on a run where this step had been reached and the offer left docs/ out of it:

this is a memory asset as part of design, so it goes into docs/ […] if it is realated to some harness/feature/tool that detailed infromation/design/ planning/etc go into that harness’ docs/

Requirements are produced while BUILDING, and they are not the thing built. Without this step they end as an issue and a conversation — which is how the output of the process that exists to produce durable requirements becomes the one thing the knowledge graph never learns.

Three rules, and the first is the one a run skips:

  • Ask; never pick silently. The destinations are DERIVED from the owning instance’s declared graphs at the time of asking, none is a listed answer, and if nobody answers nothing is created and “asked, answered none” is recorded. kg-contribution-offer carries the option set and the question that identifies a design-memory asset.
  • It goes in the OWNING instance’s docs/ — a cat-harness feature’s reasoning in cat-harness/docs/, a folio’s subject matter not in the platform at all. placement decides where inside it: architecture/ for why it is shaped this way, guides/ for how a person does something with it, reference/ for generated material that is never hand-edited.
  • Not fsh-guts. That is the declared non-rendered trashcan and its content may be thrown away or lost. A design record’s whole value is that it survives the conversation that produced it.

What separates the record from the skills the same phase produces: a skill carries what a competent practitioner needs in order to do the task; everything past that line — background, options not taken, how to reach a data source, an API’s full surface when the task touches three calls — is documentation. Both directions fail silently, so state which one you are writing before you write it.

A harness feature’s documents: proposed in docs/proposals/, filed in docs/requirements/ (STRICT)

Owner, 2026-09-23 (issue #1164): when the feature is the harness’s own, the documents this process produces (initial analysis, MVP, the options, the agreed requirements) live and are updated under docs/, in two declared sub-graphs of it.

stagewherewhat it ischecked by
Phases 1–5, and while buildingdocs/proposals/<slug>.mdthe argument: needs, options, MVP, what was agreed—
the feature shipsdocs/requirements/<slug>.mdthe promise: its front matter is a Requirementcheck:requirements

The directory says what KIND of document it is; the stage is a field (issue #2405, FR-010). The requirements document is a RequirementSet whose stage (draft … accepted, or rejected, cancelled, superseded) is recorded in the set and moved only by a recorded sign-off. The directory follows the stage — a set reaching accepted is when its proposal is filed — but it no longer stands in for it: before this, “where the file is” was the only record of a decision, and nothing said who made it.

Both kinds, proposals and requirements, declare within: "docs". Every list of kinds (the navbar’s Folders among them) therefore draws them inside the Docs row, folded shut until the reader opens it. That is general behaviour for any kind declaring within, not a special case for these two.

One proposal per feature, updated in place, never forked. A later phase edits the same page rather than writing a second one, so the history of the argument is git log on one file.

Filing on ship is a MOVE, never a copy. In Phase 6, once the owner has said to merge:

  1. git mv docs/proposals/<slug>.md docs/requirements/<slug>.md, so git log --follow walks the requirement back through its argument.
  2. Add the Requirement fields to its front matter, from bootstrap/schemas/requirement.schema.json:
    • id: req:<slug>. The id IS the file name.
    • status: in-force
    • proposedIn: the old path.
    • actors, description.
    • statements: one per agreed requirement, each with a key, a conformance level (SHALL, SHOULD, MAY or SHALL NOT) and one requirement sentence a reviewer can say yes or no to. A functional statement may add activity, capability (“I want”) and benefit (“so that”). A non-functional one may add a category. Keep the body: the reasoning stays with the promise it produced.
  3. Point the feature’s test runs at the statements they check, in folio-test-run/v1’s requirements array, as req:<slug>#<key>. The test points at the requirement, never the reverse.
  4. bun run cat check:requirements. It refuses a slug that is in both sub-graphs (a copy, or a proposal landing on an existing requirement), an id that is not its file name, and front matter the schema rejects.

The schema names no outside concept. It lives in bootstrap, so every harness has it, and check:bootstrap-concepts fails if any bootstrap schema names a derivative’s content model, layer names, organisation or interchange standard. A harness that follows a particular standard maps that standard’s fields onto these fields in its own layer, never in the base.

Not yet decided, and not to be improvised: how filed requirements are organised beyond one page per feature: grouping, numbering across features, traceability between requirements, retirement. The owner asked for a process and methodologies, and those wait on the literature search (bean qh1s) and on the assessment of open requirements standards (bean 1gf7). Until then, file one page per shipped feature and use no further structure.

A folio’s features are not filed here. This applies to the harness’s own feature work. A folio’s subject matter lives in the folio, as Phase 5 already says.

Phase 6 — Iterative development

Input: beans

For each bean:

  1. Create feature branch — always, no exceptions. Before the first edit, run the collision review in coordinate §”Starting new work”.
  2. Implement — following the accepted requirements, and, where a requirement changes a rendered surface, against the wireframe candidate the requester or BA chose in Phases 3–4. The delivery summary links the chosen candidate beside the after-screenshot.
  3. Open PR — link to the bean and the parent issue
  4. Deploy staging preview — the feature-staging.yml workflow auto-deploys to STAGING/<branch-slug>/ on gh-pages. The magenta “FEATURE BRANCH” banner at the top of every page links to the source branch and provides a “compare with main” link.
  5. Post before/after comparison to issue — use the staging-review skill. Every changed page gets a before (main) and after (staging) URL pair in a Markdown table. See schemas/staging.ts for the StagingComparison schema:
    | Page | Before (main) | After (staging) | What changed |
    |---|---|---|---|
    | Landing | [main](…) | [staging](…) | Added badge |
    
  6. Iterate on PR feedback — code review is on the PR; visual review uses the staging preview URLs. When the change touches a folio’s blocks, the page a reviewer opens is the preview’s review page, STAGING/<slug>/review/: every changed block before and after, with the heat map and outline. The review itself runs through content-change-review.bpmn. The review coordinator slices the change and assigns the slices, reviewers work them in review-task, disagreements go to adjudication, and the coverage gate must pass before sign-off.
  7. Ask user for explicit confirmation before merging to main. This is the merge-to-main sub-process, called from crdm-close.bpmn (Call_MergeToMain) once the sign-off is recorded and before the issue is closed, and run the same way for any increment the owner asks to land earlier. A stakeholder sign-off or the BA’s confirmation is acceptance of the feature, not authorisation to merge it.
  8. Update documentation — the OWNING instance’s docs/ pages and the workflow BPMNs. For the harness’s own feature, file its proposal as its requirements once the merge is agreed: see “A harness feature’s documents” above. If Phase 5’s offer chose a docs/ destination, this is where that page is written and kept true; if the implementation diverged from what was agreed, the divergence is recorded there rather than smoothed.
  9. Staging cleanup — a merged PR’s preview goes away on its own (owner, 2026-09-20): the merge is the confirmation, since the main site now shows the same thing. Everything else is retained by default. While a PR that will not be merged is open, the user adds the staging:cleanup label; once it is closed the label can no longer reach it, and removal is a feature-staging.yml dispatch the user runs with cleanup_slug and a matching cleanup_confirm (see staging-review). Never remove a staging preview any other way, and never on your own initiative.

Theme and UI review is NOT a Phase 6 step — it happens at ingestion

This section used to put theme-ui-review on the single edge out of MVP acceptance in crdm-deliver.bpmn. That call was removed on 2026-09-24. The owner ruled that theme review happens “at ingestion of graphical assets in context of website or app design”, and, asked whether that meant only there: “Yes only at ingestion” (bean 9fdi).

So GW_StakeholderOK’s accepted branch now closes the phase directly. The review runs when the graphical assets arrive, from ingest-theme.bpmn, where a finding is a decision about what the assets will be rather than a defect in something that shipped. If you are looking for where accessibility, branding and locales get checked for a UI, look there — not here.

When a round of implementation is complete (one or more beans resolved):

  1. Post a round summary comment on the issue — addressed to the BA and stakeholders, containing:
    • What was accomplished in this round
    • What remains to be accomplished (open beans)
    • Links to updated content for review (staging URLs, docs pages)
    • Before/after comparison table for changed pages
  2. Never close the issue without explicit authorization — the BA or stakeholder closes it, or the agent closes it only when the BA explicitly says to. An agent must never assume completion.

Cross-references

When a staging preview exists, every request this skill makes for feedback, review or sign-off carries it: one deep link per changed page, to the anchor where the change sits, with the same page on main as before. Where the skill declares an output contract, they go in its stagingLinks field. The rule, and where the page list comes from: staging-review §”The deep-link rule”.

Processes that run this skill

processstep(s) that name it
CRDM close-outClose issue ONLY on BA authorisation
CRDM Phase 6 — implement, MVP, acceptanceReview increment (test behaviour); Share MVP with stakeholders; Translate feedback into agent direction
CRDM — link the work to an issueScan open issues for match; Ask BA to create or link issue; Link to existing issue
CRDM Phase 1 — needsPhase 1: Identify stakeholders; Phase 1: Synthesise needs from sources; Review synthesised needs statement
CRDM Phases 2–4 — BPA and requirementsPhases 3–4: Define requirements + impact; Review requirements and impact analysis
CRDM requirementsDescribe the need (chat, issue, discussion); Link the work to an issue (calls a sub-process); Phase 1 Needs (calls a sub-process); Phases 2–4 BPA + requirements (calls a sub-process); Data model Entities + cardinalities (calls a sub-process); Phase 5 Beans + sign-off (calls a sub-process); Phase 6 Implement + acceptance (calls a sub-process); Close-out (calls a sub-process)
CRDM Phase 5 — beans and sign-offAnnounce the branch on the issue