Critical Path Analysis & Context Review

Which graph to trace

“What does the argument actually rest on?” is an impact question, so trace the union of both dependency relations — not uses[] alone:

  • editorial edges (uses[]) — what a reader must have read first. Agent/human maintained.
  • formal edges (lean.ref → Lean dep graph) — what the proof actually invokes. Machine-derived.

A critical path built from uses[] alone is missing every formal dependency the narrative never introduces, and will understate what breaks when a block changes. Build the union with cat-harness-tools/pipeline/content-graph.ts — its accessors (out, in, cone) default to the union and take an optional EdgeKind filter:

bun run cat-harness-tools/pipeline/content-graph.ts content/<paper>

Check hasFormal before trusting a union result. When the Lean Atlas cache is absent the formal edge set is empty because the data was unavailable, not because the corpus has no formal structure — report that limitation rather than a confident path.

Do not “fix” divergence between the two by editing uses[]. See AGENTS.md and the uses-editorial-review skill.

Overview

This skill traces the logical dependency chain of the paper from axioms to final results, classifying every block on the critical path by its context assumptions:

  • GENERAL: Statement and proof work at the most general level, under the weakest assumptions — only the project’s axioms / the general theory’s axioms.
  • SPECIALIZED STATEMENT: The statement itself requires a particular realisation, model, or extra structure that the general theory does not assume.
  • SPECIALIZED PROOF: The statement is general, but the proof uses tools only available under stronger assumptions (a concrete model, analytic or geometric machinery, a specific group/space, numerical or empirical data, etc.).
  • MIXED: Some parts general, some specialised.

When to Use This Skill

  • “What assumptions does this result actually need?”
  • “Is this proof general or does it rely on a specialisation?”
  • “Which results need rewriting for the general case?”
  • “Trace the critical path from X to Y”
  • “Audit specialisation dependencies”
  • “What’s the minimal assumption set for theorem Z?”
  • “Separate the general core from the specialisation”

Workflow

1. Identify the critical path

Read the paper manifest and chapter manifests to trace the dependency chain via uses[] fields. Build the DAG from the target result back to the axioms.

2. Classify each block

For each block on the critical path, read both the .md (narrative) and .ts (manifest) files. Classify by:

SignalLikely classification
Uses only the abstract/foundational vocabulary of the general theoryGENERAL
Invokes a concrete model, realisation, or extra structure not assumed by the general theorySPECIALIZED
Pulls in analytic/geometric machinery, a specific group or space, or numerical/empirical dataSPECIALIZED
Relies only on the foundational constructions defined by the project’s axiomsGENERAL

3. Identify mismatches

Flag blocks where:

  • Statement is general but proof is specialised → candidate for a general proof rewrite
  • Statement mixes general and specialised language → candidate for splitting into two blocks
  • Proof uses heavier machinery when the general argument suffices

4. Propose actions

For each flagged block, propose one of:

  • Rewrite proof at the general level (when the general argument exists)
  • Split statement into a general theorem + specialised corollary
  • Move to specialisation section (keep content, reorganise placement)
  • Add dual proofs (general + specialised via proofs[] array)
  • Accept as specialised (when no general alternative exists)

5. Architectural conventions

The paper follows a general core + specialisation architecture:

  • General results (GENERAL) live in the main sections of each chapter.
  • Specialisations live in a dedicated section.
  • A suffix on a block name denotes a specialisation variant (e.g. a -C suffix marking the specialised form of a general block).
  • Statements that have both a general and a specialised proof list both in the proofs[] array of the .ts manifest.
  • The general proof is listed first; the specialised proof second.

6. The specialisation boundary

A critical path typically flows from foundational definitions through intermediate results to a target theorem, crossing a specialisation boundary below which blocks require a concrete realisation:

def:foundation          (the project's axioms)
  → def:core-structure  (general construction)
  → thm:main            (general statement + general proof)
  ──── SPECIALISATION BOUNDARY ────
  → cor:specialized-X    (applies the general result to a concrete model)
  → ...                  (machinery available only under the specialisation)

Everything above the boundary is general; everything below requires a particular realisation.

Audit checklist

When auditing a critical path, check every object for:

  1. Lean completeness: .lean file exists? sorry count? status accurate?
  2. Worked-example pair: *-example.ts/.md pair exists? Listed in examples[]?
  3. Logical consistency: uses[] matches actual .md cross-references?
  4. Notational consistency: per the project’s conventions.
  5. Context classification: GENERAL vs SPECIALIZED — flag mismatches
  6. Cross-references: all (#label) links resolve to existing blocks?

Output format

Produce a table with columns: | Block | Classification | Specialisation signals | Action needed |

Follow with specific recommendations, using AskUserQuestion for mathematical strategy decisions (with structured options, not free-text questions).