A plan request stops at a signed-off plan

Issue #2405, owner 2026-10-07, verbatim: “if we make a request for a plan you should ALWAYS have created a requirements document and work plan for us to review before implementation. the links should shared to the user”. Decisions accepted the same day (comment): this operation lives in folio-assistant-core; the methods that say how requirements are gathered (crdm, spec-kit) stay in cat-harness, and each points here.

The trigger incident. A plan was given only in chat, and implementation started (litlfred/test#2) before any requirements document existed. The document was written afterwards. Nothing was wrong with the plan; the owner had no artefact to review before work began, and so no point at which to say no.

The trigger — a request for a plan

Any of these, in the owner’s or a stakeholder’s words, is a plan request:

  • “plan”, “make a plan”, “plan the …”, “what’s the plan for …”
  • “approach”, “what approach would you take”
  • “proposal”, “propose …”, “draft a proposal”
  • “how would you …”
  • “come up with …”

Always — content requests included. “Plan the edits to chapter 3” is a plan request exactly as “plan the new validator” is (decision 2). What changes between them is which methodology governs, never whether the gate applies.

A request to do a thing is not a plan request, and does not acquire one by being large. That is the opening brief’s job (opening-brief), which is said in chat and does not stop.

What to produce — two artefacts

  1. A requirements document. Every requirement in it follows the ONE definition in requirement-definition: a statement, a conformance level, a source, at least one success criterion with its verification method, and a sign-off owner.
  2. A work plan. Beans — one or more per requirement — each naming the req: statements it delivers and carrying a ## Done when copied from their success criteria. The rule and the shape are in requirement-definition §”The work plan is beans”.

Where they go — the methodology decides, the gate does not

Which methodology governs is decided by the existing fork in crdm-detect §”Which requirements methodology”. This skill does not re-decide it, and never blends the two (methodology-adoption).

methodologyrequirements documentwork plan
crdm — stakeholder-facing, the answer depends on a folio’s subjectcommitted under the owning harness’s docs/proposals/beans on the same branch, linked from the document
spec-kit — platform capability, content-agnosticthe spec, posted as a comment on the governing issue (never a specs/ directory — spec-kit says why)beans, linked from the spec comment

Either way the issue is the review surface: a CRDM document is linked from a comment on it, a spec-kit spec IS a comment on it.

Every link handed to the user is an absolute GitHub permalink:

https://github.com/<owner>/<repo>/blob/<sha>/<path>

— with the commit sha, never a branch name, and never a repo-relative path. Two reasons, both observed in the trigger session:

  • A repo-relative path is not a link. docs/proposals/x.md in chat is clickable only when the reader’s working directory is that repository, and a person reviewing from claude.ai or a phone has none.
  • A branch link moves. The document the owner signs off must be the document that was reviewed; a link to blob/<branch>/ shows whatever was pushed since. The sha pins it.

Get the sha after pushing: git rev-parse HEAD, then compose https://github.com/<owner>/<repo>/blob/<sha>/<path>. An issue comment is already absolute (…/issues/<n>#issuecomment-<id>). This binds every hand-over — a turn report, a PR body, an issue comment — not only a plan; turn-reporting rule 8 points here.

Then STOP until sign-off is recorded on the issue (STRICT)

After posting both links, the agent ends the turn. The requirements document is a requirement set at stage proposed (requirement-definition §”The document is a requirement set”). No implementation — no schema edit, no script, no skill text, no content block — until sign-off is recorded on the issue: a comment from the sign-off owner (or quoting them verbatim, with date) saying the plan is approved, or approving it with changes — and the decision is then recorded as a requirement-signoff attestation that moves the set to approved, which check:requirements refuses unless the signer is a human. Silence is not sign-off. A reaction is not sign-off. An approval in chat is real but not yet recorded: the agent quotes it on the issue, dated, before starting.

What is allowed before sign-off: the requirements document and its revisions (docs/proposals/ or the issue), the beans that ARE the work plan, and the branch and draft PR that carry them — continual-progress still applies to the plan itself.

This gate does not replace the methodology’s own sign-off steps. CRDM’s stakeholder sign-off (crdm-signoff.bpmn, crdm-close.bpmn) and spec-kit’s spec-before-code gate run unchanged; this is the point at which a plan request reaches them, not a second set of them.

A breach is detectable

The test that makes it so (issue #2405 scenario P1): no commit outside docs/proposals/ and beans/ lands on the branch before the sign-off comment’s timestamp. Compare git log --format='%cI %H' --name-only on the branch against the sign-off comment’s created_at. Extending bean 4kq7’s spec-before-code gate to run that comparison mechanically is that bean’s work; until it lands, a reviewer runs it by hand.

What this does NOT mean

  • It does not mean every request gets a requirements document. Only a request for a plan does. A request to fix a typo is a fix.
  • It does not mean the agent asks permission to write the plan. Writing it is the request; stopping comes after.
  • It does not mean the plan must be long. A two-requirement plan with two beans is a plan, and is reviewed faster than a long one.